We are a week behind on the construction of our client’s kitchen on the Upper West Side. The floor tile is down (Stone Source Chromtech 1.0), the ceiling is drywalled and we are now ready to grout the tile and finish the drywall.
We are a week behind on the construction of our client’s kitchen on the Upper West Side. The floor tile is down (Stone Source Chromtech 1.0), the ceiling is drywalled and we are now ready to grout the tile and finish the drywall.