web analytics

We are a week behind on the construction of our client’s kitchen on the Upper West Side. The floor tile is down (Stone Source Chromtech 1.0), the ceiling is drywalled and we are now ready to grout the tile and finish the drywall.

Getting ready to grout the floor

Getting ready to grout the floor

Cabinets Still  in Crates and Waiting to be Installed!

Cabinets Still in Crates and Waiting to be Installed!

Ceiling Ready for Electrcian to wire the light fixtures

Ceiling Ready for Electrician to wire the light fixtures

Still coming soon….cabinet installation…

Post Comment

You must be logged in to post a comment.

Click here to share on Facebook
Related Posts

Renovating? Kitchen and Bath Trends

Induction Cooking – Why it’s the Best

Estimating a Renovation Budget in NYC Part 2 – Office Fit-Out

A “Simple” Kitchen Renovation in Manhattan – A Designer’s Diary Day 17

A “Simple” Kitchen Renovation in Manhattan – A Designer’s Diary Day 15

About

about imageFeatured in The Wall Street Journal and on HGTV.com, Kati Curtis's eco-friendly firm Nirmada brings a sustainable, modern approach to design. Kati is one of the few LEED AP ID&C residential designers in Manhattan and is the owner and principal of Nirmada: Interior Architecture and Design LLC.

Rss Feed Tweeter button Facebook button Delicious button Digg button Stumbleupon button